Cleanroom Projects

Bio-Pharmaceutical
Pharmaceuticals Production, Midwest U.S.
Design and construction of a 5,000 ft2 cGMP pharmaceuticals manufacturing facility, including sterile fill suites for vials, ampoules and ophthalmic solutions.

- Class 100/1,000/10,000/100,000 (ISO 5, 6, 7, 8).
- 68°F ± 2°F & 45% RH ± 5% RH.
- Coved modular wall system, flush grid in sterile LAF areas.
- Purified water, hot & cold WFI, utility & clean steam piping.
- Sterile, high purity gas piping: CDA, N2, CO2, O2.
- Process vacuum, process waste piping systems.
- CO2 & O2 auto switchover panels, vacuum pump.
- Active cascading pressure control system.
- Part 11 compliant facility monitoring system.
- Start-up, test, balance, certification, documentation.
Pharmaceuticals Production, Mexico.
Construction of a 12,500 ft2 sterile pharmaceuticals manufacturing facility, built to cGMP standards.

- Grades A, C, D (Class 100, 10,000, 100,000; ISO 5, 7, 8).
- Coved modular wall system, walkable ceiling grid, custom pass-thru’s.
- WFI plant (vapor compression still) and hot WFI piping.
- Utility & clean steam systems.
- Clean dry air systems.
- High purity process gas piping.
- Process and sanitary waste piping.
- Diesel powered emergency generator.
- Owner equipment hook-up.
- Start-up, test, balance, certification, documentation.
Pharmaceutical Milling Operation, Midwest U.S.
Design and construction of cGMP pharmaceutical milling facility

- Class 100/1,000/10,000 (ISO 5, 6, 7).
- 63°F ± 2°F & 40% RH ± 5% RH.
- Coved, paneled walls, Luwa Membrane Diffusion® ceiling.
- HVAC included charcoal filtration and chemical dryer.
- DDC control system.
- Start-up, test, balance, certification.
- Luwa has completed multiple projects with this customer.
